Contract 30 days video: how do you write the volume formula and the platform alert?

 News    |      2026-11-07

The contract is to be kept 30 days, the number of roads and the code rate rises, and the hard drive usually lasts 10 days. The guarantee is to write the volume formula clearly: the effective capacity is roughly equal to the number of days of the road multiplied by the number of days of the storage, and the file system is to be taken off and redundant. The code rate is to be measured using the master flow, without the maximum sum of values, and without the minimum value charge of the empty scene.。

The formula is accompanied by a resolution, frame rate, code format, and whether the audio is included. These conditions are not valid for 30 days as soon as they change.。

The platform has to set the remaining days or capacity alerts. The threshold is suggested to be set at the amount that can be covered by the scheduled days, with a pre-notification of the contact person, rather than a local sound in the engine room.。

When the error is clear, check whether the code rate has been changed and whether the video has been lost or the disk is abnormal.。

The current number of routes, actual number ratios, disk availability and the number of days shown on the platform are copied on the same list on the day of the bail. Both parties sign the list.。

Saves days in natural day-to-day video series.。

The logbook can be used to record the remaining days of alert and route changes in the same feed record.。

0